HDD · trenchless
HDD / Directional Drilling
Install underground duct routes without opening a trench along the full alignment.
What we do
HDD bore
Duct pullback
HDPE supply & installation
Entry/exit pits and civil works
Site check first
For HDD we confirm start and exit points, bore length, duct quantity and size, required depth/profile, existing utilities, access and pullback space.
Project specific
Final alignment, depth and price are confirmed after the site and available project information have been reviewed.
Scope
Artivex performs the HDD and duct works. Electrical cable design remains with the client or utility unless separately agreed.
